Cooler installation methods are divided into vertical oil coolers and horizontal oil coolers. Vertical coolers have the characteristics of small installation area and easy installation. Horizontal oil coolers have the characteristics of small pressure drop and strong water shock resistance. Therefore, according to different sites, space heights, performance requirements, etc., the correct selection of vertical or horizontal oil coolers can better meet the needs of generator sets and other equipment.
(1) The cooler can be put into use only after the pressure test is qualified. Drain the internal water before starting.
(2) Check whether the pouring and venting valves are flexible and easy to use and the switch position, and whether the pressure gauge and thermometer are all installed.
(3) Check whether the foundation and support are firm, and whether the bolts of each part are fully buckled and tightened.
(4) When putting into use, put in the cold flow first, and then put in the hot flow.
(5) When putting into use the cold medium or hot medium, first ensure that the secondary line is unobstructed, then slowly open the outlet valve, and open the inlet valve after checking that there is no problem. It must be opened slowly to prevent pressure build-up. Pay attention to observe the changes in the equipment during the commissioning process. After the cooler is put into use, leakage may occur as the temperature and pressure change, and it should be checked in time.